Bidding network

Professional bidding and procurement information platform

Bidding information

General cargo category 24 years frame line bidding

Tender number: General Goods 20240126

Bidding time: 2024/01/26 12:41    Tender deadline: 2024/01/30 12:00 Bidding deadline

Jingwei Power 24 years inquiry letter.xlsx

2024Annual annual electromagnetic wire bidding specifications

1.       Quote: The carrier quote shall include,Loading equipment (wooden, wooden and other protective equipment), insurance, ticket tax, account period。

2.       Payment period: at sight120Days to pay, Way bank acceptance, spot exchange。

3.       Combination, transposition, paper wrap, twisted wire, must be placed immediately the carrier shall provide its own wooden support/木方 , wooden protective gear to prevent the shaft from rolling caused by bumping。

4.       Offer validity must be guaranteed for at least six months,The period shall not be for any reason,Ask for a price increase,If the carrier wins the bid for the route,Refusing to carry,We can arrange other carriers to carry the goods,The freight incurred shall be borne by the winning carrier,And loss,We reserve the right to penalize the carrier for three times the freight for refusing to carry the goods。

5.       General carrier We have fully understood our products and transportation requirements before bidding,Party B shall count the number of goods before loading,Check whether the packing is in good condition,Once the goods are loaded and confirmed by Party B's signature,The quantity will be deemed correct,well-packed,After leaving the factory, it shall be accepted and signed by the consignee,Party B shall be solely responsible for any problems arising。

6.       The carrier participating in the tender agrees to use the accounts payable as performance bond, and our company has the right to deduct the loss of goods, damage compensation, punishment and other losses from the accounts payable in advance。

7.       发货 : Regular order day12The transportation plan notified before the point requires that the transportation be completed on the same day, and emergency orders should be responded to at any time。

8.       Tbea: Shenyang, Xinjiang, Hengyang, strict hygiene requirements Please wrap the cargo vehicle in new plastic sheet before loading。

9.       Prescription requirements: Shandong, Hebei , Beijing Area Less-than-carload vehicle12Delivery within hours, Jiangsu Liaoning area The whole car arrived next day。

10.   Cargo damage and delay: Considering the particularity of Party A's goods, the carrier agrees with our company and the customer's opinions on the identification and treatment of the products with problems during transportation. If the goods are damaged due to the fault of Party B, the carrier shall be liable for full compensation,If the goods are scrapped, they shall be sold according to the goods,Declare value for compensation,If the goods are scrapped,Damage to the goods shall be compensated according to the total repair cost of Party A (including but not limited to repair cost, labor cost, transportation cost, room and board cost, penalty for delayed delivery, etc.),Indirect losses caused by the carrier shall also be compensated by the carrier,In addition to the compensation payable,Party A has the right to impose additional penalties on the carrier based on the damage of the goods and the impact of the damage on our company's goodwill。

11.   After the goods safely arrive at the location specified by the customer, the carrier is responsible for the recovery of the receipt, the transport receipt in the current month and the following month10Finish and submit to our company a few days ago。

12.   The carrier shall undertake that the losses caused to our company shall be paid within one month by telegraphic transfer。

13.   Tender closing date  2024130日。

14.   Upload information online。

15.   Mailing address: Xinjiang Road, Xiaozhan Industrial Park, Jinnan District, Tianjin8 

Zhu Tao (finish) : 13602170246  zhutao@jwdc.cn

Special note: The above terms are excerpts from our contract, if there is any objection, please timely feedback with our company!!

 

 

 

 

 

Tianjin Jingwei Power Technology Co., LTD

                                                      2024126

                                                                                                                                    


Problem consultation

Bidding network

Submit reference data

General cargo category 24 years frame line bidding

Bidding scheme:

* Bid amount:

(Note: Please enter numbers)

* Upload information:

(Note: Scanned copy of quotation scheme stamped, format limited compression package, picture, PDF)